Prepared forShamsi
ProjectFront Entrance & Steps
ProposalTS-2026-REG-827
Design selection827 Regal Crescent
Drawing: Design Options
Front entrance transformation render — 827 Regal Crescent

Prepared for Shamsi by Taishan Construction

Front Entrance & Steps

Full rebuild with railings.
See it before you build it.

827 Regal CrescentPrepared today

Private proposal

Prepared exclusively for this project.

Prepared for Shamsi at 827 Regal Crescent. The existing front entrance has settled, the surface materials are dated and the approach no longer suits the home. This proposal presents the selected direction for the steps and front entrance: a full rebuild in smooth slabs with modern railings.

Use the configure section below to add curbs, an interlocking landing or LED under-glows. The investment updates in real time.

Taishan Construction gold mountain mark
TAISHANDesign-First Exterior Transformation
Proposal statusDesign Selection
Prepared forShamsi
Prepared byTaishan Construction
Site address827 Regal Crescent
ReferenceDesign Options
ScopeFront entrance, steps and approach
Direction presentedSelected rebuild
Estimated durationConfirmed after selection
Last checkedChecking secure access…
Proposal IDTS-2026-REG-827
VersionV1 — Design Selection
Investment$6,785 CAD

Design visuals

See it before you build it.

Daylight and evening visuals for the selected entrance direction at 827 Regal Crescent.

Selected direction

Full rebuild in smooth slabs with railings.

The direction Shamsi has selected. Configure add-ons below to match the final scope.

Full Rebuild — Smooth Finish with Railings — front entrance visualSelected Direction
New structure · railings included · configurable

Full Rebuild — Smooth Finish with Railings

$6,785

Everything comes out. A completely new entrance built from the base up, finished in large-format smooth slabs and framed with a modern railing for safety and a clean, finished look.

Configure this direction

Entrance & steps — front view

Full Rebuild — Smooth Finish with Railings — entrance & steps — front viewExisting condition — entrance & steps — front viewBeforeAfter

Approach from the driveway

Full Rebuild — Smooth Finish with Railings — approach from the drivewayExisting condition — approach from the drivewayBeforeAfter
Full Rebuild — Smooth Finish with Railings — rebuilt entrance — front view
Rebuilt entrance — front view
Full Rebuild — Smooth Finish with Railings — steps & landing detail
Steps & landing detail
Full Rebuild — Smooth Finish with Railings — approach from the driveway
Approach from the driveway
Full Rebuild — Smooth Finish with Railings — evening view of the new steps
Evening view of the new steps
FinishLarge-format smooth slab, minimal joints, monolithic appearance with modern railings
Best forA true transformation with defined edges and the security of a railing — the direction Shamsi has selected.
  • Full removal of the existing steps, landing and interlocking approach
  • Loading and disposal of all demolished material
  • Excavation to proper depth and subgrade inspection
  • Geotextile separation and compacted aggregate base in controlled lifts
  • New step structure built to corrected rise and run
  • Large-format smooth slabs supplied and installed on treads, risers and landing
  • New smooth slab walkway to match the entrance
  • Modern railing system installed along the steps and landing
  • Drainage and grading away from the foundation
  • Edge restraint, jointing, plate compaction and full cleanup

Investment summary

Investment summary.

Option 02 — Full Rebuild with Railings is presented as a lump-sum investment covering all labour, materials, equipment, disposal and cleanup for the selected scope.

Base price with railings: $6,785. Remove railings: $5,825. Add curbs, landing or under-glows below to update the total.

Preferred direction — Full Rebuild — Smooth Finish with Railings$6,785CAD · excludes HST · valid 30 days from issue
Selected Direction · Full Rebuild — Smooth Finish with Railings — $6,785

The Taishan Effect

Why the entrance will hold up.

The preparation beneath the surface is the same discipline on every Taishan project.

01

See it before you build it

Visuals for the selected entrance so the design decision is made before any demolition begins.

02

Built properly

Proper excavation, subgrade inspection, compacted aggregate base and controlled grading beneath every step and landing.

03

Detailed to the finish

Precision cuts, mitred corners, consistent joints and optional integrated lighting configured to the final scope.

04

Warranty-backed workmanship

Six-year Taishan workmanship warranty, with a final walkthrough completed together before turnover.

Construction sequence

A disciplined path from vision to completion.

Under normal site, weather, access and material-delivery conditions.

STAGE01

Direction Confirmed

You confirm the selected entrance direction. Final measurements are taken and material selections are confirmed on site.

STAGE02

Removal and Preparation

Full removal of the existing steps, landing and interlocking approach, then loading and disposal of all demolished material.

STAGE03

Base and Structure

Excavation, subgrade inspection, geotextile, compacted aggregate base in controlled lifts and the new step structure set to corrected rise and run.

STAGE04

Finish and Lighting

Slab treads, risers, landing and walkway installed. Optional add-ons — curbs, landing or under-glows — are installed and commissioned.

STAGE05

Inspection and Turnover

Alignment, drainage, joints and edges inspected, deficiencies corrected and a final walkthrough completed with you.

Review and confirmation

Confidence
before we build

Review the selected direction above and confirm the configuration. Once the scope is confirmed, the detailed investment summary will be issued for approval.

Note: All quantities are preliminary and subject to field verification, approved material selections, site access and utility conditions.

Questions? Contact Jeff directly.
ClientShamsi
Property827 Regal Crescent
ProjectFront Entrance & Steps
Direction presentedSelected rebuild
Preferred directionFull Rebuild — Smooth Finish with Railings
Warranty6-year Taishan workmanship warranty
Proposal validity30 days from issue
Investment$6,785
Estimated startTo be confirmed